Answer
Nov 25, 2025 - 01:27 PM
Deploying or relocating a surveillance trailer is usually quick, often taking 15–30 minutes. Once positioned, the operator lowers the stabilizers, raises the mast, powers the system, and connects to the network. Because the trailer is mobile and self-contained, it can be moved and fully operational again with minimal setup time, even on changing or remote sites.
The Setup Video for the Sentry-Pro is a great example.
